Disclaimers These originated from the insurance field. They are utilised by the Survey & Engineering Professions to indicate to clients the extent of responsibility accepted and to ensure the client is aware of what is not included in the survey.

DISCLAIMER
Contour and Detail Plans.

The title boundaries as shown hereon were not marked at the time of survey and have been determined by plan dimensions only and not by field survey. Services shown hereon have been located where possible by field survey. If not able to be so located services have been plotted from the records of relevant authorities where available and have been noted accordingly on this plan. Where such records either do not exist or are inadequate a notation has been made hereon.

 

Whilst reasonable effort has been made to locate all visible above ground services, there may be other services which were not located during survey. This survey does not include a 'dial before you dig' enquiry. This survey is a detail survey undertaken to detail accuracy. If detail information is required to an accuracy greater than general detail surveys then the instructor should advise accordingly. For example, if wall or building locations are to be utilised for construction purposes, we should be advised accordingly.  The title boundaries shown on this detail plan were not marked at the time of survey and have been determined by plan dimensions only and not by field survey. If strata subdivision over this site is contemplated all buildings resulting from the development must be within the title boundaries. A registered remark survey is recommended at this time. Services shown have been located where possible by field survey. Prior to any demolition, excavation or construction on the site, the relevant authority should be contacted for possible location of further underground services and detailed locations of all services. This plan may not be copied unless this note is included.

Prior to any demolition, excavation or construction on the site, the relevant authority should be contacted for possible location of further nderground services and detailed locations of all services.

DISCLAIMER
Engineering Set Out - Buildings (1)

Set out dimensions are based on design drawings supplied to the Surveyor at the time of and for the purpose of carrying out the survey. The builder should verify all set out dimensions shown on this plan with the latest approved design drawings. Any discrepancies should be clarified in writing with the surveyor prior to commencement of the work for confirmation of this survey. The boundary location as shown on this plan is from information or marks placed by others, the verification of which does not form part of this survey.

DISCLAIMER
Engineering Set Out - Buildings (2)

Set out dimensions are based on design drawings supplied to the surveyor at the time or and for the purpose of carrying out the survey. The builder should verify all set out dimensions shown on this plan with the latest approved design drawings. Any discrepancies should be clarified in writing with the surveyor prior to commencement of the work for confirmation of this survey.

DISCLAIMER
Engineering Set Out - General

Set out dimensions of all grid lines, control lines, recovery marks and bench marks should be verified and confirmed by the builder and any discrepancies should be clarified in writing with the surveyor prior to commencement of the work.

DISCLAIMER
Identification Surveys

This plan is of an identification survey only, and as such is not examined for registration by the office of the Registrar of Titles, although it is lodged in that office for survey information only in accordance with the Surveyors Regulations 1978. No responsibility can therefore be accepted for any future difference in boundary definition which may result from re-survey of adjoining lands or subsequent registration of new survey plans.

Building Setouts

Those instructing Building Setouts can expect to be asked to endorse a certificate such as:

INTERPRETATION OF ARCHITECTURAL PLANS FALLS OUTSIDE A SURVEYORS AREA OF EXPERTISE. IT IS ASSUMED THAT OFFSETS OR OTHER SETOUT DIMENSIONS THAT ARE CONSIDERED CRITICAL TO THE INTENDED LOCATION OF THIS STRUCTURE HAVE BEEN PROVIDED AND AS SUCH ARE SHOWN ON THIS PLAN. IT IS THE INSTRUCTORS RESPONSIBILITY TO CHECK THOSE DIMENSIONS SHOWN ON THIS PLAN.

I ...................................CONFIRM I HAVE CHECKED THE DIMENSIONS SHOWN ON THIS PLAN.
SIGNED:..................................................
DATE:.................

Proposal Plans:

(i) This plan was prepared for the purpose and exclusive use of xxxxxxxxxxx to accompany an application to the xxxxxxxxx for approval to subdivide the land described in the plan and is not to be used for any other purpose or by any other person or corporation. Cromer & Partners accepts no responsibility for any loss or damage suffered howsoever arising to any person or corporation who may use or rely on this plan in contravention of the terms of this clause.

(ii) The contours shown on this plan are taken from Council Planning Scheme Sheet xxxxx and are suitable only for the purposes of this application. No reliance should be placed upon such contours other than for the purpose of this application for subdivisional approval.

(iii) Measurements and areas are subject to final survey.

(iv) This plan may not be copied unless this note is included.

SIMPLY:

Clients should discuss with their surveyor their requirements and ensure that the resultant survey satisfies their needs.

HOW WE ASSIST:

We can discuss with you the content of any proposed disclaimer to ensure that you are being provided with the correct information produced by the correct adviser.