Electricity Infrastructure Easement

glossary image: 

Electricity Infrastructure Easement: is shown in the example on the right along the upper northern boundary of the land in the plan. It is best defined by:

FIRSTLY all the full and free right and liberty for Aurora Energy P\L and it's successors and it's and their servants agents and contractors (hereinafter call "the Corporation" at all times hereafter:

a) TO maintain and lay erect and install anything used for, or in connection with the generation, transmission or distribution of electricity including powerlines (overhead or underground), substations for converting electricity, substations for transforming or controlling electricity and equipment for metering, monitoring or controlling electricity (hereinafter called "electricity infrastructure) of such materials and type as the Corporation may determine above, on or under the land respectively marked "Easement Infrastructure Easement" on Plan (hereinafter called the servient land.

b) TO enter into and upon the servient land for the purpose of examining, operating, maintaining, repairing, modifying, adding to or replacing electricity infrastructure without doing unnecessary damage to the said servient land and making good all damage occasioned thereby.

c) TO erect fencing, signs, barriers or other protective structures upon the servient land if in the opinion of the Corporation these are necessary for reasons of safety.

d) TO cause or permit electrical energy to flow or be transmitted or distributed through the said electricity infrastructure.

e) TO enter into and upon the servient land for all or any of the above purposes with or without all necessary plant equipment and machinery and the means of transporting the same and if necessary to cross the remained of the said land of the registered proprietor/s for the purpose of access and regress to and from the servient land.

NOTHING herein contained shall precent the registered proprietor/s for themselves and their successors in title from using the servient land PROVIDED THAT such use does not derogate from this grant or, in the opinion of the Corporation's electricity infrastructure locate, on or above or under the servient land.

SECONDLY the benefit or a covenant for Aurora Energy P\L and its successors with the registered proprietor/s for themselves and their successors in title of the servient land not to erect any buildings or place any structures or objects within the said easements without the prior written consent of the Corporation to the intent that the burden of the covenant may run with and bind the servient land and every part thereof and that the benefit thereof may be annexed to the easements hereinbefore described

SIMPLY:

this means that the authority that enjoys the easement has the right to erect and maintain structures on your land.It usually also means that you are not allowed to erect any structure within the boundaries of the easement

HOW WE ASSIST:

If your title indicates a Wayleave or Infrastructure Easement we can mark it's location on the ground and also show it's relationship to other structures and title boundaries. In this way one can design and build improvements without intruding into the easement and contravening the rights of the easement holder

Contact us for advice in relation to these matters.